top of page

NATIONAL FUEL GAS LINE "N" CORRIDOR
National Fuel Gas – Line “N” Corridor
Synergy Inspections provided welding inspectors to assist with the replacement of 1947 vintage 20-inch high pressure natural gas pipeline with approximately 6 miles of 24-inch pipeline. This project also added 20,620 horsepower at the Buffalo Compressor Station that will increase the capacity of Line N to meet future capacity requirements for locally produced gas transported from the Marcellus Shale Play.
bottom of page